Saturday, November 1, 2014

Consultation on changes to Bronze Street and Creekside as part of new 'Quietway' Cycle Path


Lewisham Council is consulting on the Lewisham part of the Waterloo to Greenwich Quietway. We know this because Lewisham Homes sent us a text.

No one however – not even Lewisham Homes – was consulted on the changes that have already been made to part of the route through Crossfields (see our previous post), so we're lucky to be hearing about these other plans now. However, 'consultation' ends on November 7th.

The section of Quietway that Lewisham Traffic and Parking have drawn up draft plans for involve some 'interventions' on the route between Surrey Canal Road and Creekside, as well as repairing or upgrading the road surfaces and improving lighting. For more info on the proposals see here.

At our end of the route, the intention is to close Bronze Street off from Deptford Church Street as shown in this diagram, plus repaving the 'footways' and resurfacing the road and raising the entry to the road at the Creekside end. Residents of Finch & Congers Houses who drive will still have access to their carpark area, but will no longer be able to exit the estate onto Church Street.

You are invited to comment on the plans by emailing traffic@lewisham.gov.uk.

Wednesday, October 8, 2014

Cycle path plans revealed long after work started


We reported on the cycle path improvement works back in July, and now they are almost complete twelve weeks later. Whilst the actual pavement works finished sooner than this and new (red) tarmac was laid at the main entrance to the estate before the end of September, there are still a couple of items to complete – and there appears to be no sign of the project's finishing touches being applied in any hurry.

Railings and gates are yet to be installed to replace those which were removed. Guard rails were also removed from the pavement outside the gate. Some safety conscious residents are now concerned that the new opening, whilst very convenient for cyclists, is dangerous for children who may run excitedly out of the estate and directly into the road.

In July we requested a copy of the plans for this project from both Lewisham (the road is in the borough) and Greenwich (who were doing the work). We finally received these rather belatedly from Lewisham on 23rd September after a reminder. There was no response at all from Greenwich.

The following illustration shows how the entrance was proposed to be modified (click on the image below to enlarge). 

The intention was to "take down and reconstruct pier [pillar] with same bricks and coping stone. Procure and fix new wrought iron gate and hinges". In typical planning cock-up stylee, this drawing was Photoshopped by someone who hadn't actually been anywhere near the proposed area and therefore didn't take into account the fact that the wall on the right – that they suggested should be "reduced in height to relocate existing railing" – is actually supporting a railing on the other side of the wall, which borders the garden area behind the wall and runs alongside the path into the estate (see the photo at the top of this post taken from inside the estate).

Meanwhile, on the plan we were sent (marked "not to be used for construction"), the entrance is shown as being widened on either side to a width of 3 metres:


This would have involved taking down both pillars and re-constructing them wider apart after removing the railings either side of them. Those railings (and low walls they are embedded in) would then have to be cut down in order to fit them back into smaller gaps. And a gate "double in width" 'procured'.

When it actually came to construction, only one pillar was taken down and reconstructed (as per the first illustration), and only one railing needs cutting down and re-installing, albeit a shorter width than in the illustration. A new gate (or pair of gates?) is yet to be 'procured' and fitted. In addition, the grey metal guardrail between pavement and road (the 'baffle') is to be "replaced with 6 metres of new 'visi-rail' panels". How long will it take for all these to be fitted?


Of course, the real completion of the project will be when the signs go up. If the time it took to put up the one-way signs in Deptford High Street after the new paving works is anything to go by, we've a long wait.


Thursday, July 17, 2014

More roadworks!


These roadworks at the Giffin St junction opposite Castell House started on Monday. Traffic is presently reduced to a single lane on the southbound stretch of the dual carriageway.

What are they for? We asked the foreman. He told us they're putting in a cycle lane, adjusting the position of the present traffic lights, adding a cycling waiting area to the crossing, widening the pavement (?!), taking out part of the central reservation on the south part of the junction and adding another set of traffic lights (so there will be two crossings at this junction).

He showed us his instructions from Greenwich Council which included a plan of the junction improvements and said he expected it would take about 6-7 weeks.

There's no mention of these works, however, on the Greenwich website. Nothing on Lewisham's site either, but a link to Transport for London's list of roadworks across London shows the job with a reference number, plus a start and end date (8th August – only 4 weeks).

Neither Browne, Castell or Cremer House residents have been notified of these works. During the day they'll be affected by sounds of drilling etc, and in both rush hours, a slowing down of traffic outside their homes. There may be an increase of traffic in Creekside due to rat running, which will affect other residents. A quick email to Greenwich Council's highway department was responded to with "we aim to respond to your enquiry within five working days".

The same query to Lewisham, requesting a copy of the plans, was more forthcoming but not particularly helpful: "The work is being done by Greenwich's contractor as it is part of a larger set or works being carried out, but is being paid for by L B Lewisham. I'm afraid I do not have access to the plans, the officer who is dealing with the scheme is recovering from an operation and is unlikely to be back in the office for another month."

But anyway, now you know! The consolation is that the school holidays are starting soon, which usually results in a decrease in rush hour traffic.

Thursday, December 9, 2010

Deptford Christmas Fair - Sat & Sun 11 & 12 December

Our friendly Community Involvement Officer, Will Sharp, has emailed us to tell us about Deptford Christmas Fair that's happening this weekend...He gave us a link to Lewisham Council's website.

Deptford town centre is gearing up for Christmas with a host of festive events and activities. The weekend will provide an opportunity to try out the new walking and cycling route between New Cross and Deptford town centre.

Saturday's attractions will include:

    •    a big wheel – get a free bird’s eye view of the improved route and the wider Deptford and New Cross landscape (10am-7pm, Margaret McMillan Park)
    •    rickshaws offering free rides between New Cross and Deptford market (9am-5pm)
    •    a 'smoothie bike' (11am-3pm, Douglas Way)
    •    brass band and performances by Deptford Churches Together (12noon-1pm, Giffin Square)
    •    kids’ Christmas tree decorations workshop by Other World Arts (1.30-3.30pm, Giffin Square)
    •    fun and games with Bureau Of Silly Ideas, Teatro Vivo and Madcap Coalition (11am-3pm, various locations)
    •    information stalls on local walking and cycling initiatives and the on-going regeneration of Deptford town centre (11am-3pm, Douglas Way)
    •    Christmas tree lights switch-on (3-3.30pm, Giffin Square)
    •    artisan market, Morris dancing, BBQ, mulled wine and music (11am-6pm, Tanners Hill).

Other activities will take place on Sunday around the Deptford Project railway carriage café on the high street.

The majority of funding for the event has been provided by Transport for London and Design For London.

Sunday, December 5, 2010

Creekside Urban Park Consultation - your views required

Witherford Watson Mann Architects are looking for your feedback on their plans for Creekside Urban Park. Crosswhatfields promised to post about this for those of you who were unable to get to the consultation held on 27th November. Unfortunately we've been a bit tardy in this task, but there is still a week left for you to register your views.

The plan below shows the extent of the area to be improved, and below that is a close up of the proposed changes on Crossfields itself. Generally, we can't see much at all to object to. Download the plans here for a closer look.



The proposals for Crossfields are as follows (text taken from plans):

Sue Godfrey Gardens and Space around storage sheds:

Existing
Existing Memorial Garden with established herb and wildflower planting and established trees. Garden is not maintained. Existing storage sheds in poor condition. Estate planting pocket adjacent to estate entrance has low quality planting. Garden has no water supply.

Proposed
GCDA (Greenwich Co-operative Development Agency) and CGS (Crossfields Green Spaces) organised for the existing memorial garden to be cleaned out and repaired on 08/11/10. Intention for this garden to be CGS managed space to include new growing beds and managed herb garden.
Extend Sue Godfrey garden into the poor planting pocket to give the garden a public front.
Construct new low wall to form edge to extended space with new gate.
New raised growing beds
Provide 5k budget for new planting
Refurbish storage sheds with new paintwork to woodwork (possible community arts project)
New rain water collection butts on Congers and Farrer House
Replace missing Prunus hedge planting to Deptford Church Street
Remove broken bollards and railings

Mechanics Path (the path alongside the railway opposite Holden House)

Existing
Narrow cycle path and footway along both edges of existing listed railway viaduct. To both edges are estate lawns and estate hedges. The southern arm is overgrown. Existing surfaces are poor quality asphalt with area below viaducts made up in broken rubble.

Proposed
Form new wider Mechanics Path by removing existing estate hedges – move existing railings back by 2m
Plant new fruiting hedge including Blackberry, Blackcurrant, Boysenberry, Gooseberry, Raspberry and Worcesterberry.
Construct 5m width rolled asphalt and granite edges path.
3 new seats
Apple, Pear, Plum and Quince planting to gardens in front of Holden House
Improve existing lighting of pathway
Removal of 5 Robinia / Platanus trees in connection with LBL tree officer and Network Rail support.

(As regards the removal of certain trees, we are assured that they are either identified as unhealthy/dying or causing a hazard to the railway and removal is required by Network Rail. )

If you have any comments, please write them below or email Arthur Smart (WWM Architects) here


Arthur from WWM Architects braved the cold to exhibit the plans for Creekside Urban Park at the Bulb Planting Day on 27th November, which was organised by Lewisham Homes' Community Involvement officer Will Sharp. They were joined by Claire and Davey from Greenwich Co-operative Development Agency who provided refreshments and digging power.

Tuesday, October 5, 2010

Deptford on the up

The Deptford Dame has posted about the poorly publicised consultation that occurred on Saturday (and the previous Wednesday) at The Albany, regarding the refurbishment of Douglas Way and surrounding market area – which she notes, is a pretty bleak area to walk through when the market isn't on.

She also notes that the improvement due to start in January 2011 are part of the North Lewisham Links project which is also due to go through our estate (and which galvanised John Rhodes into setting up crossfields.greenspaces.org) and are not related, funding-wise, to any improvements planned for the High Street...

The Dame attended on Saturday, and seems reasonably happy with what she heard. The consultants must've brushed up their act since Wednesday, when Guru Red went to a poorly attended meeting to find out what it was all about. She was joined by a couple of residents from the housing opposite The Albany, and a couple of street traders. They were told about ideas to move the market pitches:

- in the alley leading to the square, pitches would be moved to the centre, creating a wider path either side for access to the shops either side. The traders didn't like that.

- opposite The Albany, the pitches that line the south of the path would be moved to the side walls of the housing. The residents didn't like that. They already tolerate an inordinate amount of disturbance three days a week that makes their little houses shake. They were appalled by the idea of benches outside their homes that would more than likely become occupied by street drinkers.

The traders were also not pleased to hear that the storage space for their barrows was likely to be moved again since the new parking space (behind the Albany presently, but only just recently moved from the 'Deptford Project' yard) is privately owned and about to be developed. They also took the chance to complain about the new parking arrangements for visitors that has seen a large and significant drop off in trade.

Red Guru could hardly get a word in edgeways, but it occurred to her that it was a bit bloody late to be asking those immediately affected by the new plans for their opinions or ideas. Perhaps the Albany management had some input into the consultation at some point. The Dame commented that this consultation seems to be about what colour paving stones to have, and must have her tongue in her cheek when she says it would appear the 'start date of January 2011 is achievable'.

Personally, I'd go for some trees, mend and clean the paving that's already there, and IF IT AIN'T BROKE, DON'T FIX IT...Anything that needs any maintenance will almost certainly NOT BE MAINTAINED (Giffin Square is a prime example)...As usual, these things come round every ten years or so – we get new stuff built with some pocket of new funding, instead of proper and continued maintenance of what is already in place.

For a limited glimpse into the subject see the council's website here.
See the Deptford Dame's post here.

Meanwhile, didn't someone say (Joan?) that building on the new Deptford station would start in October? And what are the plans for the high street?

Postscript: I realise I have forgotten that pitches will need to be rearranged to accommodate a CYCLE PATH...one would imagine that this would be best situated running down the residential side...